  • Hydraulic Investigation and review of Ingham’s water supply system to service proposed 41 Lot Subdivision, Scovazzi’s Road, Toobanna (LCJ Engineers / John Peebles, 2013);
  • Whitsunday Shire Council Cannonvale WWTP Effluent Outfall Pipeline RPEQ Certification (UDP Group and Whitsunday Shire Council, October 2013);
  • Hydraulic modelling and Phase 1 Investigation Report for the commissioning of the Blair Athol to Clermont Coal Mine Pipeline following their 2014 major Augmentation (Glencore Coal and Engeny Water Management Consultants, 2014);
  • Hydraulic modelling and concept design for the 2ML/d Emergency Water Supply Project for Bamaga (TRILITY, 2015);
  • Detailed engineering review and report on the operation of Mather Street sewage pump station to determine the root cause for pump cavitation, excessive ragging and associated “water in oil” pump fault alarms (TCC Wastewater Operations, 2015);
  • Planning investigation for the upgrade of the Magnetic Island water supply system to accommodate fire-fighting flows to the existing Magnetic Island Water Recycling Facility (MIWRF) located at Cockle Bay and the proposed Waste Transfer Station on West Point Road.
  • Sewage Flow Assessment to existing sewer pump stations, PS3042 and PS3033, Terranora area, Tweed Shire (STP Consultants, 2015);
  • Hydraulic Investigation and review of TCC’s water supply network to service a proposed fire pump service to the Recall Warehouse, Woolcock Street, Townsville (Parker Hydraulics, 2015);
  • High level water supply assessment and review of Burdekin Shire Council’s proposal to implement booster pumps to overcome pressure deficiencies and related concerns within Ayr’s water supply distribution network when subject to fire flow conditions (Burdekin Shire Council, 2015);
  • Hydraulic Investigation and review (using TCC’s WaterGems Model) of TCC’s water supply network to service the proposed redevelopment of the Mater Hospital, Fulham Road, Townsville (UDP Group, 2015).
  • Hydraulic and Engineering Investigation and review of the existing 300AC and 375 DICL water supply pipeline servicing the Northern Peninsula Regional Area to improve the existing system and to mitigate current operational concerns (TRILITY, 2015 / 2016);
  • Planning Report into the Upgrading of James Cook University’s Townsville Campus Water Supply and Wastewater Networks (Brookfield, April 2016);
  • Water Supply Planning Report for the Proposed Redevelopment of the TAIHS Health Care Development Site, Gorden Street Townsville.  (October 2016);
  • Watercad Modelling and hydraulic Investigation for the proposed Riverside Ridge Master Plan Development Stages 1 to 9 (UDP Group, October 2016);
  • Water Supply Investigation and Planning Report for proposed 85 Lot Subdivision, Merinda (UDP Group, December 2016).